The PICMS Construction Pack covers CHAS, Constructionline, SafeContractor and CDM 2015 — plus the underlying ISO 45001 H&S framework, hazard register, RAMS library, training matrix, contractor inductions, and RIDDOR-aware incident handling. £89/month, no separate ISO subscription needed to start.
UK construction tender qualification runs on three pre-qualification schemes — CHAS, Constructionline, and SafeContractor — plus the statutory CDM 2015 regulations that govern duty-holder responsibilities on every project. Most main contractors require at least two scheme memberships; some require all three.
The construction-compliance burden is fundamentally about three things: passing your annual SSIP (Safety Schemes in Procurement) re-assessment by maintaining current evidence, fulfilling your CDM 2015 duty-holder role on every active project, and demonstrating ongoing competence through training records, RAMS, and incident handling. Each scheme has its own questionnaire and evidence demands; the underlying ISO 45001 H&S management system underpins them all.
Most UK construction SMEs come to PICMS with a CHAS folder on the shared drive, RAMS in a Word template that nobody updates, a training matrix in Excel that diverges from reality the first time someone leaves, and a CDM file for last project's job that took 40 hours to compile because it was reverse-engineered from email. The standard isn't asking for perfection — it's asking for a current, evidenced, defensible system.
SSIP-recognised pre-qualification across H&S, environmental, quality, equality, financial, and information security. Annual re-assessment with detailed evidence requirements. PICMS structures the evidence library against CHAS questionnaire categories.
Bronze, Silver, Gold tiers with progressively deeper assessment. Most public-sector framework agreements require Silver or Gold. PICMS evidence vault feeds the same controls into Constructionline's assessment fields.
Alphabet's H&S-led scheme used by major property and FM clients. Annual desktop audit. PICMS organises H&S documentation, training records, RIDDOR statistics, and policy versions for the assessor.
UK statutory law for every construction project. Duty-holder roles (Client, Principal Designer, Principal Contractor, Designers, Contractors), pre-construction information, construction phase plans, health and safety files. PICMS tracks duty-holder appointments and CDM evidence per project.
Increasingly demanded on top of SSIP schemes for tier-1 frameworks and major contractor pre-qualification. PICMS includes the full ISO 45001 module set if you upgrade beyond the Construction Starter tier.
Statutory reporting to HSE for specified workplace incidents. PICMS Incident Command Centre flags RIDDOR-reportable events at log-time and tracks the 10-day or 15-day notification deadline (depending on incident type).
Per-project hazard ID with 5x5 risk scoring. RAMS templates pre-loaded. Send-to-client RAMS with PDF + audit log. Site-specific risk assessments with control linkage.
Documents organised against CHAS / Constructionline / SafeContractor questionnaire categories. Annual re-assessment becomes a download exercise rather than a hunt.
Contractor inductions, sub-contractor PQQ tracking, visitor sign-in/out, vehicle access logs. CDM 2015 Principal Contractor evidence in one place.
Per-person competency tracking with expiry alerts (CSCS card, SMSTS, SSSTS, IPAF, PASMA, first aid, fire warden). Toolbox talks, refresher records, induction completion.
Voice-enabled on-site incident logging. 5-Whys investigation. RIDDOR flagging on log-time with deadline tracking. Auto-CAPA generation. Evidence chain-of-custody.
Substance inventory with COSHH assessments, safety data sheets attached, exposure controls, health surveillance triggers, scheduled reviews.
UK construction H&S legal register pre-loaded (HSWA 1974, CDM 2015, Work at Height 2005, LOLER 1998, PUWER 1998, COSHH 2002). Auto-bridges new HSE regulatory updates.
Per-project compliance hub — pre-construction info, construction phase plan, RAMS, training records, incidents, CDM file. One project, one URL, everything that matters hanging off it.
Auditor-credible vendors don't pretend software replaces site safety. PICMS does not:
What PICMS does is give you, your team, your client, and your assessor a single source of truth — so the SSIP renewal is a verification exercise, not a documentation hunt.
It keeps the evidence a UK contractor needs for SSIP schemes (CHAS, Constructionline and SafeContractor), CDM 2015 and, when asked for it, ISO 45001 in one system. PICMS organises documents against the scheme questionnaire categories and holds RAMS, the training matrix, contractor and sub-contractor records, COSHH, RIDDOR-aware incident reporting and a compliance hub for each project.
PICMS Construction Starter is £89/month for 5 users, with the CHAS, Constructionline and SafeContractor evidence library, hazard register, RAMS, training matrix, contractor management, COSHH and RIDDOR-aware incidents. Professional at £449/month adds three ISO standards, such as ISO 9001, 14001 and 45001, with 15 users and the Construction pack included. There is a 14-day free trial and nothing is charged for 14 days.
Often, yes. SSIP schemes such as CHAS are the usual starting point, but tier-1 frameworks and major contractors increasingly ask for ISO 45001 in tenders and pre-qualification on top of SSIP. PICMS includes the full ISO 45001 module set when you move up from Construction Starter, so the evidence you already hold carries across.
No. PICMS organises the evidence so the annual re-assessment is a download rather than a hunt, but the submission through the scheme's assessor portal is yours. PICMS is independent of these schemes and is not affiliated with or endorsed by them.
14 days free, full feature access, nothing charged until the trial ends. Built by an IRCA® Registered Principal Auditor — auditor-credible from day one.